技术档案

矿井疏排水与雨水管网改造Mine dewatering and stormwater conveyance

矿井排水及雨水管网

每条都摘自下方编号的来源原文;只写事实,不写预测或建议。

技术简介

  • 该工程安装雨水输送系统,既包括新建,也包括拆除并更换现有雨水系统设施。1
    Installation of a stormwater conveyance system that includes new installation and removal and replacement of existing stormwater system features.

已有应用

  • Nutter Fort 二期工程拟通过水平钻孔和帷幕排水设施疏排 Pitcairn 矿井积水。1
    Dewatering of Pitcairn mine via horizonal bore and curtain drains.

主要参与者

  • Bear Contracting 从事 HDPE 管道安装、矿井工程及复垦和环境治理施工。2
    Bear Contracting serves the energy sector by performing gas compressor station site work, developing gas well sites including constructing access roads and drilling pads, installing HDPE piping, constructing deep mine face-ups, and performing reclamation and environmental mitigation work.

未定事项

  • 招标文件规定,除获批豁免外,项目使用的钢铁、制成品和建筑材料必须在美国生产。1
    Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.

来源

  1. thethrashergroup.com · 2026-07-03
  2. bear-contracting.com · Bear Contracting – Where Quality Counts